Improvements/Changes
Since 2002
WHITENING: Ensure periodic pool whitening.
DECK REPAIRS: Repaired cracked/broken areas.
BATHHOUSE FLOOR: Replaced all tile flooring in bathhouse.
SNACK BAR: About $3,000 worth of improvement to snack bar.
HOLDING TANK: Rebuilt in-ground holding tank behind pump house.
EXTEND DECK: Extended deck of main pool about 8'. (Toward pavilion.)
PAVILION: Built pavilion on hill for parties and other events.
BATHHOUSE BRICK: Repointed exterior brick.
FENCING: Replaced fencing between bathhouse and pump house.
BABY POOL FILTER: Installed separate filter system for baby pool to prevent "accidents" from closing main pool.
PING-PONG COURT: Repaced deteriorated shuffleboard court with new concrete slab.
STORAGE SHED: Constructed new storage building to store equipment during winter.
BABY POOL TARPAULIN: Purchased tarp for baby pool to prevent debris from falling into pool during winter.
POOL FURNITURE: Replaced