WHITENING: Ensure periodic pool whitening.

 

DECK REPAIRS: Repaired cracked/broken areas.

 

BATHHOUSE FLOOR: Replaced all tile flooring in bathhouse.

 

SNACK BAR: About $3,000 worth of improvement to snack bar.

 

HOLDING TANK: Rebuilt in-ground holding tank behind pump house.

 

EXTEND DECK: Extended deck of main pool about 8'. (Toward pavilion.)

 

PAVILION: Built pavilion on hill for parties and other events.

 

BATHHOUSE BRICK: Repointed exterior brick.

 

FENCING: Replaced fencing between bathhouse and pump house.

 

BABY POOL FILTER: Installed separate filter system for baby pool to prevent "accidents" from closing main pool.

 

PING-PONG COURT: Repaced deteriorated shuffleboard court with new concrete slab.

 

STORAGE SHED: Constructed new storage building to store equipment during winter.

 

BABY POOL TARPAULIN: Purchased tarp for baby pool to prevent debris from falling into pool during winter.

 

POOL FURNITURE: Replaced